1 Sloan Stop
CONTROL STOP AND REPLACEMENT PARTS Code No. Description H-700 Stop, chrome plated: Screwdriver Angle Stop with H-1010-A Vandal Resistant Cap Complete Stops 3308384 H-700-A 3/4” NPTF inlet for adjustable tail 3308386 H-700-A 1” NPTF inlet for adjustable tail 3308385 H-700-AG 3/4” NPTF inlet for ground joint tail. Product Description. Sloan H-541-ASD 1' Screwdriver Stop Repair Kit From the Manufacturer. Since 1906, Sloan Valve has been the world's leading manufacturer of water-efficient solutions that are built to perform, guaranteed to last, and are designed with the hopes of promoting a healthy environment through water conservation.
Sloane | |||||
---|---|---|---|---|---|
The black & orange bollards mark the alignment of the future LRT tracks and platforms | |||||
Location | Eglinton Avenue East at Bermondsey Rd/Sloane Ave Toronto, Ontario Canada | ||||
Coordinates | 43°43′33″N79°18′45″W / 43.72583°N 79.31250°WCoordinates: 43°43′33″N79°18′45″W / 43.72583°N 79.31250°W | ||||
Platforms | Centre platform | ||||
Tracks | 2 | ||||
Connections | |||||
Construction | |||||
Structure type | At grade | ||||
Disabled access | Yes | ||||
Other information | |||||
Status | Under construction | ||||
History | |||||
Opening | 2022 (1 year's time)[1] | ||||
Services | |||||
|
Sloane is a surface light rail transit (LRT) stop under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Victoria Village neighbourhood at the intersection of Eglinton Avenue and Bermondsey Road/Sloane Avenue.[2] It is scheduled to open in 2022.[1]
The stop is located in the middle of Eglinton Avenue East on the east side of its intersection with Bermondsey Road and Sloane Avenue. The stop will have a centre platform. Access to the platforms will be via the pedestrian crossing on the east side of the signalized street intersection.[2] East of the stop, between the two mainline tracks, there is a double-ended siding for trains to enter and exit from either direction on either main track.[3]:1:28–1:35
Sloan 1 Screwdriver Stop Repair Kit
During the planning stages for Line 5 Eglinton, the stop was given the working name 'Bermondsey' after Bermondsey Road on the south side of Eglinton Avenue. On January 14, 2016, the Metrolinx board of directors approved changing the stop name to 'Sloane' after Sloane Avenue on the north side.[4]
Surface connections[edit]
The following routes would serve this station according to the report presented at the board meeting on February 25, 2016:[5]
Route | Name | Additional Information |
---|---|---|
91 | Woodbine | Northbound to York Mills Road and southbound to Woodbine station |
References[edit]
- ^ abSpurr, Ben (February 17, 2020). 'Eglinton Crosstown faces another setback, delayed until 2022 The Star'. Toronto Star. Retrieved February 18, 2020.
- ^ ab'Bermondsey Stop'. Eglinton Crosstown. January 14, 2016. Retrieved November 4, 2017.
- ^'Eglinton Crosstown Surface Flyover - December 2020'. Metrolinx. January 6, 2021.
- ^Mackenzie, Robert (January 14, 2016). '???'. Transit Toronto. Retrieved November 4, 2017.
- ^'Changes to TTC Bus Routes in Eglinton Corridor for Line 5 Rapid Transit Line'(PDF). Toronto Transit Commission. February 25, 2016.